It's getting exciting

hargil

Silver Level Poster
It's getting close.....

The status has now moved to;

Order Placed: 05-09-2012
Status; In Building
Production Time: 10th working day


It's getting exciting.

(my wife says I should really grow up - he he - she just doen't understand...)
Anyone have any realistic estimates as to how long it takes from now?
 

tom_gr7

Life Serving
Shouldn't take long mate, a day in building - today , then a day in testing/quality control - tomoz. Then ready for dispatch!!!! fingers crossed mate :)
 

hargil

Silver Level Poster
Shouldn't take long mate, a day in building - today , then a day in testing/quality control - tomoz. Then ready for dispatch!!!! fingers crossed mate :)

Jolly good, can't wait.

At least some good news today!!!
the MOT man says my Focus has a broken spring on the back....
ah well what else would I do with £60...

could have been worse.

Soon be looking forward to days of configuring applications, tweaking this, tweaking that - Oh what fun...
lots of stuff to do regarding SSD management, I'm not going to get any sleep soon ;-)

And of course I have to try out all the different colour lights for the keyboard, white sounds nice but must give each colour a chance, it's only fair ;-) Blue also sounds good.
 

dlatimer

Bronze Level Poster
I'm only on my second working day, currently at the Pre-production stage. I have a new computer itch already and I can't wait to get my hands on it!!
 

hargil

Silver Level Poster
Yippee!!!!

Mine has now entred the 'Awaiting Dispatch' (11th working day) phase.

should have it soon...


I have all my installation CD ready, all my software keys ready, an order of installations...

If it arrives tomorow i will have a very busy weekend, how do I tell the wife we have to cancel her birthday meal.... best not i think... ;-)
 

hargil

Silver Level Poster
It has been despatched, I have a DPD tracking number.

It seems to have gone from pre-production in a matter of two days.

So some of the time it was in order processing and pre-production it was actually in some of the other stages.

I guess it's hard to update the computer system at every stage.

11 working days.

So with a bit of luck i will get it tomrorrow.

So exciting...
 

psmiguel

New member
Hi, I am like hargil last Tuesday, today it moved to: In building 10th working day....!!

COOLERMASTER CM STORM ENFORCER - GAMING ENTHUSIAST CASE
Processor (CPU) Intel® Core™i7 Quad Core Processor i7-3770 (3.4GHz) 8MB Cache
Motherboard ASUS® P8Z77-V: PCI-E 3.0 READY, WIFI, SLI, CROSSFIREX
Memory (RAM) 16GB KINGSTON HYPERX GENESIS DUAL-DDR3 2133MHz X.M.P(4 x 4GB KIT)
Graphics Card 1.25GB NVIDIA GEFORCE GTX 570 - 2 DVI, HDMI, DP - 3D Vision Ready
Memory - 1st Hard Disk: 240GB INTEL® 330 SERIES SSD, SATA 6 Gb/s (upto 500MB/sR | 450MB/sW)
Second Hard Disk: 1TB WD CAVIAR BLACK WD1002FAEX, SATA 6 Gb/s, 64MB CACHE (7200rpm)
DVD/BLU-RAY Drive 24x DUAL LAYER DVD WRITER ±R/±RW/RAM
Memory Card Reader INTERNAL 52 IN 1 CARD READER (XD, MS, CF, SD, etc) + 1 x USB 2.0 PORT
Power Supply CORSAIR 750W ENTHUSIAST SERIES™ TX750 V2-80 PLUS® BRONZE (£86)
Processor Cooling INTEL SOCKET LGA1155 STANDARD CPU COOLER
Sound Card ONBOARD 6 CHANNEL (5.1) HIGH DEF AUDIO (AS STANDARD)
Network Facilities 10/100/1000 GIGABIT LAN PORT - AS STANDARD ON ALL PCs
USB Options 6 x USB 2.0 PORTS @ BACK PANEL (MIN 2 FRONT PORTS) AS STANDARD
Operating System Genuine Windows 7 Professional 64 Bit w/SP1 - inc DVD & Licence
 

hargil

Silver Level Poster
Mine went from build to me in a matter of two days

I have mine now and I'm busy configuring it.

The speed is incredible. SSD are the way to go.

It will soon be with you.
 

psmiguel

New member
Last Monday, 11th working my desktop day was in Testing and QC. Tuesday was delivered and today was received by my wife 10:16.
I ordered it the evening 8th September, so in total it took 17 calendar days to the whole process. I consider it EXCELLENT.
 
Top