Fast Track

harvey107

Member
Ok so I’ve ordered my desktop and been given a build date of the 27th November, was thinking of having the Fast Track 5 days but was wondering how much this speeds things up or worth it? Thanks
 

harvey107

Member
Because there are new AMD graphics cards coming that will be much better than the current crop (6800 and 6800XT coming 18th November, 6900XT 8th December assuming the information I read was accurate)). There have also been new NVIDIA cards as well
Fair enough, thanks. The others are a bit out of my price range when looking to upgrade and the 5700 xt has got good reviews and better reviews with the latest drivers and is good enough for what I need. There will always be new stuff down the line, that’s how I look at it.
 
Top