My system was due to be built tomorrow 28th July got an email on Friday 24th July saying it was being built today. Seen it was still sitting on pre production so messaged PCS and it's now been moved to 30th July. Gutted LOL!!
Gutted, did they give a reason?
It could be because one or more builds failed testing and had to go back into build, or possibly a serious RMA needed looking at.Gutted, did they give a reason?
Just been told my build date of the 3rd was "accurate". Lets see how accurate it is
race ya?Same, mines also being built the 3rd.
Had two emails today one saying that it was being built and then a later one stating it was in the test stage I reckon I will get my new laptop very soon
If all goes well, mine should be updated to Build next Monday! I cant wait to get away from my crappy 2015 Base model MacBook pro
That's not nice, 2015 base model Mac Book Pros have feelings too you know. [emoji1787]If all goes well, mine should be updated to Build next Monday! I cant wait to get away from my crappy 2015 Base model MacBook pro
Just looking at the recent posts it does seem as though build times are quite close to pre-COVID levels. Dilly dallying is never a good idea in any case.Have the production times dropped to pre lockdown levels, when I got a quote on my latest version of the build im considering its now saying 16-18 working days as opposed to the 21-23 days it was saying a week ago for a similar build, if so think i might place my order whilst thegoing is good and stop dilly dallying before this dammedable covid thows another spanner in the works