Martinr36
MOST VALUED CONTRIBUTOR
Could possibly have beenMaybe it was a business order?
Could possibly have beenMaybe it was a business order?
Has to be a business order, there is no way one person is ordering 45 of them, even if it’s just the 3080s in the order that’s over 30k orderMaybe it was a business order?
No way?! I’m on nearly 40 pre production days, have all the other parts in stock and someone who has ordered after me gets put into building first? That doesn’t make any senseUpdate for all of you patiently waiting. I ordered on 4th November, it was 22 days in production and today I received an email to say it was in build 🥳
Ryzen 9 5950 and a standard RTX3080. So fingers crossed some of you also get a build email today 🤞
will depend on the parts and some paid the extra build timeNo way?! I’m on nearly 40 pre production days, have all the other parts in stock and someone who has ordered after me gets put into building first? That doesn’t make any sense
paid quicker build times don't matter with pre-order parts, confirmed by PCS, and most of us here are waiting on the 3080 only, other parts sorted outwill depend on the parts and some paid the extra build time
I spoke to them on Monday and was 191st of 1401, so if they're at 1356 it suggests they've had 45 available for builds this week as well as another 45 for the business order (obviously this isn't fact I'm just guessing).I wasn't planning on chasing my order for another week but with people getting an idea of where they were in the queue, I figured I'd try the Live Chat and see what response I got.
All they could tell me was that my GPU, the standard RTX 3080 was the shortage initially but when asked directly if I could get a queue position I am 703th out of 1356 right now. My order was placed on the 30-10 and hasn't been amended during that time.
Guessing it'll be at least 3 weeks, so figure I'll wait, impatiently, 'til the 21st and ask again if I'm not contacted prior or see it going into Building.
This is excellent advice. I understand the desire to know how your build is going, but a watched pot never boils and a picked scab never heals. These variable and unknown delays would test the patience of a saint, but patience is the only positive weapon that you have. It will be worth the wait.I'm at a point now where when it arrives it arrives, don't set yourself on any particular time/date there are too many variables involved. It will be worth the wait
45 working days, pre-production, 3080 strix, i9-10900K, CORSAIR 750W RMx SERIES™ MODULAR 80 PLUS® GOLD, ULTRA QUIET
I have been following this thread for a while now and from all the info i have seen kindly posted by others I have absolutely no idea when it will go into building stage, I have pretty much lost all hope of getting this before xmas. I appreciate the fact that this situation is completely out of PCS`s control but i feel that a little more communication would be appreciated by all that are waiting. I have noticed that on the forums of Overclockers they seem to be posting regular updates on components received, something along those lines might go a long way into helping people get some sort of idea of the situation even if it is a quick post once a week. Maybe its a silly idea, dunno, just a thought.
I do often wonder why the strix cards are so rare, maybe the scalpers/miners got to them first. I am still in two minds as to whether to try switching to a standard 3080, don`t really want to wait until maybe February.... damn my impatientnessnussI had the same idea - I'm not sure if we can mention competitors but the two main ones post updates to their forums or give more communication on queue time at least. But 3080 Strix is ridiculous - there literally hasn't been any update to Europe at the very least whereas the other aftermarket cards (and the FE!) all have been getting some stock.
A lot depends on context and how orders are defined on their system, which in turn relies on the chat customer support knowing this as well.Apparently im 855th in a queue of 1361 people!! - ordered 05.11.20.
i recently was requested to change my PSU due to stock shortages so i swapped the 850w to 1000w... will this have changed my position in the queue??? as if it has i will be extremely annoyed as this was done purely to speed up my order not to delay it.
i have also been told by Live chat - verbatim ""There are multiple orders for many GPUs at same order....for instance unique order considering 45 GPUs 3080. And I counted 45 units in one order."
Why on earth are PCS allowing orders of 45 units in one order???????
i am extremely close to cancelling my order i cannot comprehend how annoyed i am with this live chat this morning.
I would hazard a guess it’s down to MLCC shortages (And some other substrates).I do often wonder why the strix cards are so rare, maybe the scalpers/miners got to them first. I am still in two minds as to whether to try switching to a standard 3080, don`t really want to wait until maybe February.... damn my impatientnessnuss
I would be interested if you discovered anything with regards the two xmas builds. I was told yesterday to ignore those emails (which has been said on here frequently) and that they are still guaranteeing xmas delivery for anyone who ordered (and who didn't pick a part that said it's not available yet- pre order etc) . There is however a chance you may have to switch a component when the parts are actually picked, but you will be told. Had a good chat about the process in general. Very informative and I felt relaxed about it after, despite ordering a PC for xmas for which I had an email saying it will be built on 28th Dec... lolI'm 55 days in, after getting told on chat that I was going to go into build on the 16th Nov, still no end in sight, to make matters worse I ordered a PC for the boys xmas a week ago (guaranteed xmas delivery and all that....all parts in stock as didn't include a 3080) and received an email today saying it was due to go into build on the 21st!!!! Waiting in the queue on the phone now, I wonder how they will build, test and deliver to Scottish Highlands by 24th????
Some PSUs are on back order as well, and someone earlier in the thread said that getting a key for Windows had delayed his build - but really it could be anythingCould there be anything in mine other than the 3080 that could be causing a delay?
Case
LIAN LI LANCOOL II GAMING CASE
Processor (CPU)
Intel® Core™ i7 Eight Core Processor i7-10700K (3.8GHz) 16MB Cache
Motherboard
ASUS® PRIME Z490-P (LGA1200, USB 3.2, CrossFireX) - ARGB Ready
Memory (RAM)
16GB Corsair VENGEANCE DDR4 3600MHz (2 x 8GB)
Graphics Card
10GB NVIDIA GEFORCE RTX 3080 - HDMI, DP (Delivery before Xmas not guaranteed)
1st M.2 SSD Drive
1TB PCS PCIe M.2 SSD (2000 MB/R, 1100 MB/W)
Power Supply
CORSAIR 750W TXm SERIES™ SEMI-MODULAR 80 PLUS® GOLD, ULTRA QUIET
Power Cable
1 x 1 Metre UK Power Cable (Kettle Lead)
Processor Cooling
Corsair H100x Hydro Cooler w/ PCS Ultra Quiet Fans
Thermal Paste
STANDARD THERMAL PASTE FOR SUFFICIENT COOLING
Extra Case Fans
2x 120mm Black Case Fan (configured to extract from rear/roof)
Sound Card
ONBOARD 6 CHANNEL (5.1) HIGH DEF AUDIO (AS STANDARD)
Network Card
10/100/1000 GIGABIT LAN PORT (Wi-Fi NOT INCLUDED)
Wireless Network Card
WIRELESS 802.11N 300Mbps/2.4GHz PCI-E CARD
USB/Thunderbolt Options
MIN. 2 x USB 3.0 & 2 x USB 2.0 PORTS @ BACK PANEL + MIN. 2 FRONT PORTS
Operating System
Windows 10 Home 64 Bit - inc. Single Licence [KUK-00001]