My order
Case
CORSAIR 4000D AIRFLOW TEMPERED GLASS GAMING CASE
Processor (CPU)
AMD Ryzen 5 5600X Six Core CPU (3.7GHz-4.6GHz/35MB CACHE/AM4)
Motherboard
ASUS® TUF GAMING B550-PLUS WiFi (DDR4, USB 3.2, 6Gb/s) - ARGB Ready!
Memory (RAM)
16GB Corsair VENGEANCE DDR4 3200MHz (2 x 8GB)
Graphics Card
4GB NVIDIA GEFORCE GTX 1050 Ti - DVI, HDMI, DP
1st Storage Drive
2TB SEAGATE BARRACUDA SATA-III 3.5" HDD, 6GB/s, 7200RPM, 256MB CACHE
1st M.2 SSD Drive
512GB INTEL® 670p M.2 NVMe PCIe SSD (up to 3000MB/sR | 1600MB/sW)
Power Supply
CORSAIR 750W RMx SERIES™ MODULAR 80 PLUS® GOLD, ULTRA QUIET
Power Cable
1 x 1 Metre UK Power Cable (Kettle Lead)
Processor Cooling
CoolerMaster Hyper 212 (120mm) Fan CPU Cooler Black Edition
Thermal Paste
STANDARD THERMAL PASTE FOR SUFFICIENT COOLING
Sound Card
Creative Sound Blaster® Audigy™ FX OEM
Pre-production is now 20 working days, order placed almost 1 month ago.
Sorry but this delay is not acceptable, there is no communication, BUT the main reason im complaining is that payment is taken at the point of order which is incredibly unethical.
Payment should ONLY be taken when the actual build starts. Taking my money and then placing me in a 30+ day backlog queue is customer adversarial.
Im incredibly angry about this. Waiting times and potential out of stock/low stock items should be made clearer.
If theres a long waiting queue because of high demand fine, but DONT take my money until you work on my order.
Ill be visiting trustpilot to leave my feedback when this resolves.
Case
CORSAIR 4000D AIRFLOW TEMPERED GLASS GAMING CASE
Processor (CPU)
AMD Ryzen 5 5600X Six Core CPU (3.7GHz-4.6GHz/35MB CACHE/AM4)
Motherboard
ASUS® TUF GAMING B550-PLUS WiFi (DDR4, USB 3.2, 6Gb/s) - ARGB Ready!
Memory (RAM)
16GB Corsair VENGEANCE DDR4 3200MHz (2 x 8GB)
Graphics Card
4GB NVIDIA GEFORCE GTX 1050 Ti - DVI, HDMI, DP
1st Storage Drive
2TB SEAGATE BARRACUDA SATA-III 3.5" HDD, 6GB/s, 7200RPM, 256MB CACHE
1st M.2 SSD Drive
512GB INTEL® 670p M.2 NVMe PCIe SSD (up to 3000MB/sR | 1600MB/sW)
Power Supply
CORSAIR 750W RMx SERIES™ MODULAR 80 PLUS® GOLD, ULTRA QUIET
Power Cable
1 x 1 Metre UK Power Cable (Kettle Lead)
Processor Cooling
CoolerMaster Hyper 212 (120mm) Fan CPU Cooler Black Edition
Thermal Paste
STANDARD THERMAL PASTE FOR SUFFICIENT COOLING
Sound Card
Creative Sound Blaster® Audigy™ FX OEM
Pre-production is now 20 working days, order placed almost 1 month ago.
Sorry but this delay is not acceptable, there is no communication, BUT the main reason im complaining is that payment is taken at the point of order which is incredibly unethical.
Payment should ONLY be taken when the actual build starts. Taking my money and then placing me in a 30+ day backlog queue is customer adversarial.
Im incredibly angry about this. Waiting times and potential out of stock/low stock items should be made clearer.
If theres a long waiting queue because of high demand fine, but DONT take my money until you work on my order.
Ill be visiting trustpilot to leave my feedback when this resolves.