Much like the RTX3080 thread I thought it would be nice to have a thread to see when the new CPUs are arriving and being dispatched.
Heres my template:
Original order date: October 7th 2020 09:02
Modified: November 5th 2020 2pm
CPU: 5900X
No GPU build, confirmed all parts in stock (awaiting CPU).
Status: Pre-production (24 working days)
Worth checking the local stock informer sites: https://www.stockinformer.co.uk/checker-amd-ryzen-5000-zen-3-cpu
Heres my template:
Original order date: October 7th 2020 09:02
Modified: November 5th 2020 2pm
CPU: 5900X
No GPU build, confirmed all parts in stock (awaiting CPU).
Status: Pre-production (24 working days)
Worth checking the local stock informer sites: https://www.stockinformer.co.uk/checker-amd-ryzen-5000-zen-3-cpu
Last edited: